Tuesday, October 21, 2008

 

Summitt Engineering To Conduct Study On Proposed Hatfield-McCoy River Trail System.

The Pike County Fiscal Court enttered into a contract with Summitt Engineering. It will allow the company to conduct a study on what needs to be done to construct a proposed Hatfield - McCoy River Trail System.

The study is expected to be ready by the spring.

The project calls for a trail for people to ride canoes from the Martin County line to the Virginia line.

The study cost projected to be $ 10,000.





<< Home

This page is powered by Blogger. Isn't yours?